Euroclad On Site Production

The Euroclad On Site team can arrive to site and produce sheets following a 10 minute simple trailer setup. Sheet can be rollformed then lifted using a Euroclad Spreader beam. For more information on Euroseam Site Production and Method Statements, please contact the Production Office at Euroclad.

Site Relocation

The Mobile Rollformer has it's own 3 Phase Power supply that can supply power for a full 10 days of rollforming without the need to refuel. Euroseam profiles can be produced from either the Euroseam Mobile 1 Rollformer or the new Euroseam Mobile 2 Rollformer.

Reloacation to multiple set-up points around larger project sites aren't subject to the usual problems associated with sourcing powers supply, also the Mercedes Actros Tractor Unit is kept with the rollformer during production to offer an simple relocation procedure without the requirement of crane assistance.

Coils

Coils of either Aluminium or Steel, are delivered to site seperatley to the rollformer. The coils are safely loaded through access doors at the back end of the rollformer. To reduce the number of lifts required throughout the Euroseam production time, 2 coils can be located to the coil mandrel enabling production runs of upto 2600lm without the need for coil replenishment.

Audi Dealership - Cardiff

Audi Dealership - Cardiff

Aluminium Coil Coils used weigh a maximum of 1.8 tonnes, therefore standard 2.5 counterbalance or telescopic fork trucks can be used.Euroclad can supply manower to load the coils. Euroclad Supply Trained Personnel for Production, to ensure we produce the product to site program. A pre-production site visit will proceed each rollforming session followed by first - a site specific method statement, then the production.

Audi Dealership - Cardiff

Audi Dealership - Cardiff
Profile Production